Oscar Larson & Associates
ENGINEERING PLANNING CONSTRUCTION MANAGEMENT
International Projects
Industrial Park on the Caspian Sea, Dagestan, Russia
OLA performed technical, organizational and financial studies, pre-designs, technical studies and designs for a 100-hectare Industrial Park. The primary tenant was a hide tanning plant with a vertically integrated operation to process cow, goat, sheep, and seal hides, produce leather products, and produce leather clothing
The leather products and clothes were for sale to international markets.
OLA designed:
- Process Facilities
- Administration Facilities
- Water and Wastewater Treatment Facilities
- Dormitories
- Clothes Assembly and Sewing Facilities
- Security, Waste Handling and Logistics Facilities
Tomato Canning Plant, Kazakhstan
OLA's assignment was to design a modern Tomato Canning Plant. OLA prepared all studies, design, and construction documents and programs, program schedule and budget. OLA developed operations and staffing plans.
Toothpaste Manufacturing Plant, Omsk, Siberia
OLA performed:
- Site Evaluations
- Prepared Optimization Studies
- Prepared Designs
- Developed Construction Drawings
- Developed Program Budgets
- Facility Layout and Equipment Schedules
Russian Health Ministry
OLA prepared studies, budgets, and program recommendations for:
- Hospitals and Clinics
- Diagnostic and other Medical Equipment
Ice Skating Arena Complex, Kemerovo, Siberia
OLA prepared civil and site, studies, designs, construction drawings, specifications, material logistic's management, construction engineering; and operations, maintenance and repair manuals.
The Arena included:
- A Full Range of Skating Venues
- Viewing Stands for 3,000
- Ammonica based Ice Making Equipment
- Ice Grading Equipment, including Zamboni
- Interior Decor; kitchen, restaurant, furniture
- Administration and Maintenance Facilities
- Meeting Rooms
- Showers, Lockers, and Exercise Rooms
Exterior and site design included parking, utilities, lighting and signage.
Environmental Ministry of Dagestan
OLA was asked to perform studies and designs to:
- Develop Fish Farms to Grow Sturgeon
- Enhance Fish Stocks
- Increase Caviar Production
- Design and Develop Facilities for Fish as a Food source
OLA prepared studies, designs, and management programs to develop and construct:
- Growing Ponds
- Water Systems
- Waste Treatment Systems
- Levees
- Fish Harvesting Systems
- Roe Harvesting Facilities
- Fish Processing
- Fish Canning Facilities
- Product Distribution Systems
Pacific Island Utility Company
OLA performed power plant, water and sewage plant, facility inspection and program recommendations:
- Site Inspections
- Prepared Facilities Assessment Reports
- Prepared Facilities Upgrade Recommendation
For Additional Information:
Contact us to help you create cost effective, and timely project solutions. For more information, or to talk about a specific project, call OLA at 800.660.2043 or email to larson@olarson.com